Monday, December 6, 2010

No Default Application Sims 2 Install Mac

Senatoleaks non proprio come Wikileaks

Taken from the press release of the Senate of 3 December 2010
"President Schifani the presentation of the archive information of the" Commission massacres "(December 6, 2010). One million pages, available in 1222 folders digital
The archive, consisting of the documents produced or acquired by the Commission - the latter coming largely from the courts, institutions, government departments - is collected in 2098 records, preserved in 1222 folders. All this is now available in digital format. Archive information includes 1 million pages, the result of work of the Commission from 1988 to 2001, from X to XIII Legislature. Pages on the most tragic and controversial history of the Republic, in some cases covered by the relevant parliamentary inquiries: Pecorelli murder by the Bologna massacre, when Cyril from the attacks of '93. And again, Gladio and "red Gladio," Piazza Fontana, Borghese coup, murder Calabresi, Peteano massacre, massacre dell'Italicus, Piazza della Loggia, the Moro case, the P2 lodge, Mitrokhin case. In all, 31 lines of investigation. The documents have been cataloged and digitized with the help of a relational and software are now available in the reading room of the Historical Archives of the Senate, through an inventory of the items of analysis, indexes of names, places and institutions, and through a free text search. "

activity put publicly available documents and important secrets, after a period of time adequate to ensure the safety of the people involved, has always been held by institutions. But right now it is natural to tie the story of Wikileaks. Schifani as Assange? None could ever think of but the parallel seems one would want to entertain those who are about to much more serious reading of the paper.
In documents (those funds) is spoken of many massacres and many sad events of our recent past. From the Moro affair Bologna massacre, now a million pages are available to us to find, as some needle in a haystack, some "news" real drowning in data and documents. Who knows what the inside there may be some time bomb ready to explode at the right time during the next parliamentary crisis in ?
In the meantime here is a gift to readers of LEXCIVILIS the link to the login page separately documents, where you can find the press release the original one of the most famous murder.


Happy reading, waiting to see what will come out of this initiative.


Wednesday, December 1, 2010

Rules For The Card Game Fustration



To complete the picture shows clear from our President Antonio Sau, on the history and authorship of the decisions taken, which showed conclusively that the Association on October 22, had no effect on the deliberations of the the Institutional Committee of the Basin, and never has participated in conferences held in recent months of service, I would like to make some considerations.

alarmed citizens are probably shaking at all, as Mr. Frau.
fact that map (solution 4) with red dots, which indicate the objects to be demolished and relocate, is nothing more than a plan di massima delle cose da fare, di tutte le opere da eseguire, dei sottoservizi da spostare ecc.
Gli addetti ai lavori ovviamente sanno perfettamente che quello NON E’ AFFATTO IL PROGETTO CHE SARÀ REALIZZATO . Infatti per progettare gli INTERVENTI REALI saranno necessari rilievi topografici di dettaglio, e non certo una foto aerea stampata in quella scala; saranno necessarie indagini geognostiche specifiche in profondità e non certo i sondaggi in corso, finalizzati alla caratterizzazione dello stato di inquinamento dei terreni superficiali; saranno necessari studi sulle mappe catastali per verificare esattamente la posizione dell’alveo e degli argini, dei manufatti e delle case; saranno necessari diversi stadi Resuming the project from the preliminary final to the executive, during which you can perform inspections in places of design in order to study the exact path of the new flume (not to the river) you will build with the work of made safe.

By this I mean that the three houses that are shown in the paper with the red ball along the right bank of the river at the kindergarten, maybe the end result that the design will all be standing there without any demolition and reconstruction or maybe just simply relocate.
mean to say that only after the design is able to understand really what will become of all that area.

The worrying thing however, this means that should alarm people is the fact that currently the only portion of the bed that you're going to design is a stretch of the riverbed between the SS 195 and the mouth and that the rest still do not even speak.
After two years and after several resolutions and ordinances, yet in reality it is continuing to postpone the integral design of the necessary interventions for security of the entire auction river, from mountain slopes to the mouth. I should mention that the gloss is well known: "defends the plain in the mountains" while it is true the opposite, because the water comes down from the mountains with its load of sand, stones and vegetation, and pours this burden on the plain and into the riverbed. S and does not stop this transfer from upstream to downstream and left free to wander the river, carrying hundreds of thousands of cubic meters of sediment at the most intense rainfall, the problem will never be solved.

Instead of preparing a preliminary draft and consistent from upstream to downstream, as the Association has asked October 22 at the time in documents filed with the competent authorities (see our blog in January 2010 http://22ottobre. blogspot.com/2010_01_01_archive.html) it was decided to make a stew of interventions, but we do not know what to do with timing which activates the design and implementation of interventions. So the opposite of what we did for the Rio S. Lucia, in which the project had been unified and made in batches.

The other defeat on the front instead of the environment is the type of resection of the riverbed has been chosen: a river bed turned into a canal that the river will no longer have anything, forced by the banks and ground stiff, devoid of any natural, with little or impossible to availability of places. In spite to all the principles of bioengineering and the design carried out by following these principles and which occurs in half of Europe for decades now. Forget

short for that stretch of river that we can talk about "River Park" and renaturation of the riverbed. What we see is a canyon section trapezoidal, with its banks lined with gabions filled with stones and metal with the bottom that will soon be filled with lush reeds in the long run will block the flow section, especially if maintenance, paid for entirely by City Council will not be made consistently every year.

He was not sure why the Association on October 22 auspicava venisse fatto per la soluzione dei problemi e per la messa in sicurezza del territorio.

Tactical Scope Sight In

DESIGN AND CONTROVERSY CONTROVERSY CONCERNING THE REPLY FOR THE IMPLEMENTATION OF THE SECURITY SECTION OF THE MOUTH OF THE RIO SAN JEROME

Il Signor Luigi Frau in una sua recente interrogazione al Sindaco del comune di Capoterra afferma che, “ da qualche giorno è costantemente subissato di telefonate effettuate da cittadini che abitano a Rio San Gerolamo che manifestano una certa preoccupazione dopo aver appreso che il Progetto per la “Messa in sicurezza idraulica del quartiere San Girolamo e delle infrastrutture viarie, del quartiere Frutti d’Oro, della foce e del ponte sul Rio Masoni Ollastu”, avrebbe subito delle modifiche sostanziali. Infatti, se dovessero corrispondere al vero le notizie pubblicate sul sito dell’Associazione October 22, at the City Council approved the project and later in Services Conference, should have been changed significantly enough to be considered new connotations with the number 04 . "Then after pointing out that the resolution of the City Council Capoterra (No. 15 of 03/29/2010) " while recognizing the validity of the 03 project, which involved a large number of relocations " proposed the adoption of resolution 2002 stated "that some leaders of October 22 was attended, it seems, to a "Conference of Services" which has become necessary to remedy in the design errors found in that period just behind the second anniversary of the event ", asked the mayor if" given the time elapsed between the call of the day on Nov. 4 and the day on which the present is learned of more disturbing news about the veracity of the rumors about the relocation and then further modifying Project 02. "

do not know what the Mayor has responded to the question of Mr. Frau.

Instead, we know that is not secret but it is written very clearly in Resolution No. 1 OF 22.04.2010 committees established by the 'AUTHORITY' OF REGIONAL BASIN.

( http://www.regione.sardegna.it/documenti/1_38_20100520132036.pdf )

Subject: Analysis of the physical condition of the Rio San Girolamo-Mason Ollastu following the event of flooding of October 22, 2008. Review and integration of the study called Plan Sketch of river belts, for testing the boundaries of the river belts and the identification of actions necessary first (structures, constraints and directives), to achieve a set of course d’acqua compatibile con la sicurezza idraulica del territorio e la salvaguardia delle componenti naturali e ambientali. (Ordinanza n. 9 del 30.12.2008 del Commissario Delegato per l’emergenza alluvione in Sardegna del 22 ottobre 2008).

(...)

CONSIDERATO che il giorno 04.12.2009 si è svolta apposita fase di presentazione pubblica, nella quale Direzione di Progetto e Consulenza Scientifica e il rappresentante del Raggruppamento di imprese incaricato hanno illustrato dettagliatamente le prime risultanze dello studio in argomento relative alla “Proposta assetto infrastrutturale base. " At the presentation has been called the City of Capoterra who participated with the Mayor, other Councillors and Aldermen, the City University of Cagliari consultants and representatives of the "October 22"

(.. .)

WHEREAS, on 15.04.2010, at the office of the Regional Public Works, in the presence of the Secretary-Basin Authority, Councillor of the LL . PP., representing the Institutional Committee, met with the Mayor and two Councillors of the City of Capoterra and that in such a place were further emphasize the peculiarities of the three approaches, especially in terms of maintenance of works and safety. In particular, partial integration of the resolutions adopted by the City Council Capoterra with Act No. 15 of 29.03.2010, the directors have been the opportunity to further integrate the optimal design by providing a channel dimensionally consistent with solution 2 supplemented with riverside areas consistent with the third variant solution B, doing this also to be aware about the higher maintenance costs resulting from this proposal, was also represented the opportunity to change the configuration of the access road to the neighborhood San Girolamo, realizzandola attraverso la strada dei Genovesi anziché con la bretella di nuova realizzazione ipotizzata nello studio proposto dal raggruppamento incaricato.

(...).

TENUTO CONTO che in sede di discussione preliminare alla votazione, l’assessore Giuliano Uras ha espresso parere favorevole alla approvazione della ipotesi progettuale (...) denominata soluzione proposta n°3 variante B, mentre gli altri componenti del Comitato Istituzionale presenti hanno concordemente ritenuto di individuare quale ipotesi di intervento da attuare quella che preveda un alveo dimensionalmente coerente 2 (...) but with the solution path with the axis of the stream and use of the riverside areas consistent with the B variant of solution 3;

RESOLUTION

1) to determine which possible interventions to be implemented, subject to the necessary depth planning by the Councillor for Public Works, owner of the implementation of interventions, el 'acquisition of required permits, including a one dimensional channel consistent with solution 2 in the study developed by The Consortium Intecno - DHI Turin, spa and ART Hydrodata Environment Resources Land Ltd. "path but with the axis of the stream and use of the riverside areas consistent with the solution 3 variant B;

This has been reiterated in Institutional Committee discussions N. 1 OF 22/09/2010 ( http://www.regione.sardegna.it/documenti/1_19_20101004191542.pdf )

In the paper published on our website There is the possibility of intervention that "provides a channel dimensionally consistent with solution 2" (...) but with the axis of the stream path and utilization of riverside areas consistent with the B variant of solution 3 .

Then in April it was known what now seems like a novelty.

The thing that leaves us baffled is to learn that some representatives of our Association were participating in a phantom Services Conference which has become necessary for correcting the design errors found in the latter period, just behind the second anniversary of the event.

The only conference where some services to representatives of participating is that of 22ottobre 04.12.2009 (as also documented in the resolution), where, however, was also present Mr. Frau.

In summary, the study presented in April by the company Hydrodata see the following design solutions for the valley section:

Solution 01 - the first made in the study Hydrodata version in November 2009, hotly contested by all because created the basin in closed quarters.

Solution 2 - Alveo 50-m section and up to 1 m high levees - relocation reduced to a few buildings: sole mother in front of the school basement, greenhouse, electric cabin, farm, farm fruit d 'Gold, Leeward Bar, Retail Lumber and swimming pools - New way to access the area of \u200b\u200bthe district Rio S. Jerome with the insertion of a new roundabout - solution requested by the town but considered the worst by the same hydraulic engineers Hydrodata


Solution 3A and 3B - from riverbed 30 m section, up to 1.5 m high embankments - largest relocation in the right side of the subdivision S. Jerome with several homes to be rebuilt - Access road to the district Rio S. Jerome who follows the old route of the Genoese.

Solution 4 - channel 50-m section of the relocation of three buildings, two houses, the rest are always the same - Increased protection of the left bank upstream of the nursery (area Serre Peron) - Access road to the district Rio S. Jerome who follows the old route of the Genoese.

(see previous post)

La delibera n. 1 del Comitato Istituzionale dell’autorità di bacino regionale del 22 aprile 2010 (ripeto 22 aprile 2010) decide che l’ipotesi di intervento da attuare è la Soluzione 4.

Questi sono i fatti, tutto il resto sono chiacchiere.

Antonio Sau