Wednesday, October 27, 2010
I Have White Bumps On My Balls Are They Herps
Tuesday, October 26, 2010
Skate Online Tech Deck Live
Questa è la lettera che ho scritto ai soci fondatori dell’associazione dove c’è quello che io ho visto e vedo nella nostra associazione.
22Ottobre The Association was founded by a group of people from all over the territory of Capoterra who decide to create an association that is dedicated to the resolution of the many emergencies arising after the flood and the promotion of sustainable development.
Despite being born with an undeniable environmental connotations, the association is to be distinguished from other national environmental groups for its strong local roots. This means that we aim to directly intervene in the dynamics (including behavior) of our territory in order to improve the quality of life.
Association, strictly nonpartisan, look for the confrontation with the political institutions and the environment in the interests of all citizens, and tends to act as a liaison between the institutions and the area informing them and making proposals to solve the problems of our country.
To do this we have proposed groped to agree with the agencies:
or the safety of our land, water courses, of primary and secondary roads, coasts,
o l’attivazione immediata di un piano di protezione civile comunale che preveda un programma di formazione ed informazione dei cittadini sui rischi a cui sono soggetti ed un sistema di allerta in caso di pericolo imminente;
o la promozione dello sviluppo sostenibile.
Da quando è nata (marzo 2009) l’associazione ha organizzato incontri pubblici, con la partecipazione di tecnici ed esperti, per spiegare i motivi del fenomeno alluvionale e delle criticità del territorio di Capoterra. Altri incontri hanno informato on the phases of the project plan for the safety of the area. We have also created a photographic exhibition that documents the flood of 2008, and a day of cleaning the beach of golden fruit.
The Association aims to promote environmentally friendly initiatives concerning the use of the environment and the ethics of consumption: in this perspective is part of the birth of the Solidarity Group Purchase - GAS 22ottobre.
Also thanks to recognition by the city administration, the association has actively participated in the discussion that led to the final draft of the preliminary plan for la messa in sicurezza del Rio San Gerolamo, proponendo varie osservazioni recepite poi dai progettisti.
A breve organizzeremmo un incontro con la cittadinanza per informare sullo stato dei lavori per la messa in sicurezza del Rio San Gerolamo e sull’evoluzione dei progetti.
Questo è un po’ il riassunto dei fatti (formati da parole e da circolazione di idee) che ha prodotto la nostra associazione. Da quando abbiamo iniziato siamo stati definiti in vari modi, da “quelli del Gange” (all’inizio) a “filosofi” (ultimamente).
Secondo me questo è quasi un motivo di vanto visto che crediamo in un modo di fare politica diverso e questo genera spesso confusione. Il modus operandi che abbiamo scelto per portare avanti le nostre idee (e per essere un interlocutore credibile per le istituzioni) è quello di informarci e di informare. Per esempio, per quanto riguarda l’alluvione del 22 Ottobre ci siamo confrontati con i meteorologi che ci hanno spiegato il fenomeno, con i geologi che ci hanno fatto capire lo stato del territorio, gli ingegneri idraulici che ci hanno fatto vedere le conseguenze dell’onda di piena.
Abbiamo studiato i progetti proposti dalla società incaricata dalla regione e le leggi e i decreti riguardanti l’alluvione.
Sono convinto che sia fondamentale poter incidere sulle scelte che riguardano il riassetto del nostro territorio partendo dalla progettazione delle opere perché, se queste non sono ben progettate, i soldi che verranno utilizzati saranno soldi sprecati.
Penso che si possa incidere sulle decisioni riguardanti il riassetto idrogeologico del nostro territorio senza il bisogno di denunce alla magistratura, urla o manifestazioni, ma con incontri dove si ascoltino le idee e le esigenze dei residenti per portarle ai politici ed ai tecnici preposti alla progettazione delle opere.
Credo infatti che le conoscenze e le competenze siano un arma very effective in order to reach our goal, and our understanding of all citizens of Capoterra.
course there are people who do not think so, (there are even one of the founders of the association!) Believe the most effective and other types of pressure to ensure that the works are carried out as soon as possible.
Ben are such initiatives as the only important thing is the safety of our territory. But you can not believe (or pretend to believe) that in these two years has not done anything.
To see the river may seem so. But you should not look only river. Sure, the words still weigh like boulders councilor Charter in April promised the work began in June. But, on closer examination the state of things, time is not spent in vain.
There was an important moment of what is called participatory democracy, with the engineers in charge of drafting the preliminary draft for the safety of the Rio St. Jerome had a meeting with representatives of the area and also with our association, receiving many suggestions. To do this, surely it took more time, but it was preferable to a project (even if done by the best professionals) top-down that would have shortened the time maybe a few months but imposed choices can not be shared? I do not think so.
This discussion led to a plan for the future of our country (I hope for some things still questionable) that in any case, should give the maximum safety for the citizens who live there without changing too much territory.
So I think the request (which is already formulated in Viale Trento alderman Sannitu) more stringent (after 6 of 04 Ordinance No. 10, 2010, read here: http://www. regione.sardegna.it/documenti/1_38_20101011124334.pdf ) to go to the region to draw up a plan of chrono-action with realistic time frames and that each block is immediately communicated and justified.
This would lead to a double result: the residents to see that things are moving and bring back a bit 'of trust in politicians and politics in general.
The immediate activation of the municipal civil protection plan that provides a program of training and informing the public about the risks faced by, and a warning system in case of imminent danger, on the other hand, freely give more security on the immediate.
Sau Antonio, president of the October 22, one of the Ganges, a philosopher.
Sunday, October 17, 2010
Do Flamin Hots Give U Cancer
The news of October 14, 2010 - The newly elected Councillor for Public Works, Sannitu Sebastian, one week after setting the new council, making use of the exceptions in extraordinary quality of implementing the Deputy Commissioner Hugh Cappellacci , has signed a decree to confer, with immediate effect, the preliminary design of the first tranche of work to be carried out in the territory of Capoterra. In practice, it triggers procedures for the hydraulic system of the Rio San Gerolamo and reconstruction of public works damaged by Poggio dei Pini to the mouth. This is really just a part of the overall work that will solve, for now, the only danger in this subdivision between St. Jerome and the mouth using the first tranche of funding amounting to € 11,317,510 from the Ministry of ' environment.
In recent months, the offices of Public Works Councillor had initiated procedures for the execution of samples required for the study of environmental characterization necessary in accordance with the rules on the Sites of National Interest (which belongs to the whole territory of Capoterra included in the SIN - Sulcis Iglesiente). It is also already left the study for the screening procedure needed to assess the need for execution of the study also for the Environmental Impact Assessment in the hope that the design can follow a simplified and therefore faster.
remember that the Assessor of Public Works is the implementing body of all planned on the basis of a total budget of € 35,517,510, then the tasks should be entrusted with the design of all interventions, under the so-called Plan Hydrodata, and then to approve the projects and the next phase of the contract
External Graphics Card For Laptops
Commissioner delegato per l'emergenza alluvione del rio S. Girolamo, Ugo Cappellacci, in data 4 ottobre 2010 ha emanato una ordinanza nella quale si approva la programmazione di dettaglio degli interventi individuati dallo studio "Analisi dell'assetto fisico del Rio San Girolamo. Masone Ollastu a seguito dell'evento di piena del 22 ottobre 2008" e nello studio di fattibilità predisposto dall’Assessorato dei Lavori Pubblici concernente gli “Interventi da eseguire sulla diga in località poggio dei Pini”.
Gli interventi sono così denominati:
1 - Sistemazione idraulica del Rio San Girolamo – Masone Ollastu e interventi di ricostruzione delle opere pubbliche danneggiate nella località Poggio dei Pini ed altre frazioni dalla mouth upstream (11,317,510 euros)
2 - Interventions of formal safety of the dam, ancillary works and connection to the dam system to the watercourse (€ 3.500.00)
3 - hydraulic system of the Rio San San Girolamo - Masone Ollastu and reconstruction of public works damaged in Poggio dei Pini, and other localities: New crossing at Lake Poggio dei Pini (8.7 million Euro)
4 - Remake of the SS 195 crossings on the canal and Rio San Girolamo Masone Ollastu - ANAS (9.2 million Euro)
5 - hydraulic system of the Rio San San Girolamo - Masone Ollastu and reconstruction of damaged public works in the village of Poggio Pines and other localities. Since the conclusion of the Treaty referred to in paragraph 1 to the upstream (12 million euros)
With this practical can be initiated operations planning of interventions and subsequent procurement and execution of works, which may not have a short time.
Wednesday, October 13, 2010
Moccasin Boot Pattern Free
